当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:underground minesites which avoid major engineering structures, both on the surface and underground (highways, bridges, buildings, abandoned workings of old underground mines, and so on). The Tower Colliery, an underground longwall mine southwest of Sydney, is a representative example, with the surface topography over是什么意思?

待解决 悬赏分:1 - 离问题结束还有
underground minesites which avoid major engineering structures, both on the surface and underground (highways, bridges, buildings, abandoned workings of old underground mines, and so on). The Tower Colliery, an underground longwall mine southwest of Sydney, is a representative example, with the surface topography over
问题补充:

  • 匿名
2013-05-23 12:21:38
避免重大工程结构的地表和地下(公路,桥梁,建筑物,被遗弃的老地下矿山的运作,等等),的地下minesites。塔煤矿,井下长壁煤矿西南悉尼,是一个典型的例子,几个陡峭的河流gorges.the表面覆矿表面地形,走过了一条高速公路,穿过峡谷之一,六双大跨度箱梁桥。因此,一个主要的地面沉降监测方案已经到位几年,包括密集的传统,GPS和EDM测量,加上实时监测桥梁结构的关键组件(hebblewhite等,2000)。
  • 匿名
2013-05-23 12:23:18
地下minesites,避免重大工程结构,无论在地表和地下(公路、桥梁、建筑物、放弃旧的运作地下矿,等等)。 大楼的煤矿,一个地下longwall排雷的西南悉尼,是一个典型的例子,在海面地貌的上层排雷包括几个陡峭面三峡的________韏啗表面是由一个高速公路,跨越的一个峡在双床,6-SPAN箱形橋樑桥梁。
  • 匿名
2013-05-23 12:24:58
避免主要工程学结构,在表面和地下的地下minesites (高速公路、桥梁、大厦,老地下矿被摒弃的工作,等等)。 塔煤矿,悉尼地下长壁开采法的矿西南,是一个代表性例子,当表面地势躺在上面矿包括几道陡峭支持的河峡谷。表面由在双胞胎横渡其中一道峡谷的高速公路,六间距,箱子大梁桥梁横断。 结果,一个主要表面沉淀监控程序是到位几年,包括密集勘测,加上桥梁结构(Hebblewhite等的重要组分实时监视的常规, GPS和EDM 2000年)。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭