求翻译:After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction是什么意思? 待解决
悬赏分:1
- 离问题结束还有
After the award of a construction contract to a general contractor, the owner may ask the contractor to start a portion of the work before signing of the contract by giving the contractor a letter of intent or after signing of the contract by issuing a written notice to proceed. The contractor then obtains construction
问题补充: |
|
2013-05-23 12:21:38
建造合同的总承包商的裁决后,雇主可能会要求承包给承包商的意向书或签约后开始工作的一部分,在签约之前发出书面通知继续进行。承包商取得施工许可证,根据需要,从当地的建筑,水,下水道,公路部门,政府机构,如。
|
|
2013-05-23 12:23:18
该奖后建造合同的承包商,一般,则拥有人可要求承建商在开始之前的一部分工作的签署的合同的承包商提供的意向书或签署合约后发出的书面通知,继续进行。 该承建商随后获得建筑许可证,如有需要,从政府各机构,例如在当地建立、水、污水渠、和公路部门。
|
|
2013-05-23 12:24:58
在一个建筑合同的奖对一个一般承包商,所有者也许要求承包商在签字合同之前开始工作之后的部分通过给承包商意向书或在签字合同以后通过发布一个书面通知进行。 承包商然后获得建造许可,如所需求,从政府机构,例如地方大厦、水、下水道和高速公路部门。
|
|
2013-05-23 12:26:38
后的建设工程总承包合同奖、 所有者可能会要求承建商开始前签订合同给予一份意向书的承建商,或继续通过发出书面的通知合同的签署后的工作的一部分。承建商然后获得建设许可证的规定,如当地的建筑、 水、 污水渠和公路部门的政府机构。
|
|
2013-05-23 12:28:18
null
|