当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本分项工程为westmoreland bridge系梁,总共有系梁5根,截面尺寸1m*1.2m,主要工程量有:C30砼33.8m3,T22钢筋2.6吨;T12钢筋2.2吨。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本分项工程为westmoreland bridge系梁,总共有系梁5根,截面尺寸1m*1.2m,主要工程量有:C30砼33.8m3,T22钢筋2.6吨;T12钢筋2.2吨。
问题补充:

  • 匿名
2013-05-23 12:21:38
Sub-item of the project for the the westmoreland bridge tie beam, a total of five tie beam section size 1m * 1.2m, Major Quantities: C30 concrete 33.8m3 t22 reinforced 2.6 tons 2.2 tons; t12, reinforced.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
A duty project is westmoreland the bridge tie beam, altogether has tie beam 5, section size 1m*1.2m, the main resilience includes: C30 tong 33.8m3, T22 steel bar 2.6 tons; T12 steel bar 2.2 tons.
  • 匿名
2013-05-23 12:26:38
This project the Westmoreland bridge beams, a total of 5 with root, section 1M*1.2m, of main works are: C30 concrete 33.8m3,T22 reinforced 2.6 tons; T12 steel bar 2.2 tonnes.
  • 匿名
2013-05-23 12:28:18
提交订单。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭