当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:基础预留洞应配合水、暖、动、电等相关专业图纸进行施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基础预留洞应配合水、暖、动、电等相关专业图纸进行施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Basis should be reserved for holes with water, warm, dynamic, electric and other related professional drawings for construction.
  • 匿名
2013-05-23 12:23:18
Reserved-dong basis should tie in with water, and warm, interactive, electronic, and other relevant professional drawings for construction.
  • 匿名
2013-05-23 12:24:58
The foundation reservation hole should coordinate the water, warmly, to move, correlation specialized blueprints and so on the electricity carries on the construction.
  • 匿名
2013-05-23 12:26:38
Basis for reserved holes should be combined with water, warm and dynamic, electricity and other related professionals to construction drawings.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭