当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:线路走向结合油井、脱气站、加压站地理位置,地形、地貌,选择合理走向,力求线路顺直,缩短线路长度,节省钢材和投资;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
线路走向结合油井、脱气站、加压站地理位置,地形、地貌,选择合理走向,力求线路顺直,缩短线路长度,节省钢材和投资;
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
In conjunction with alignments, pressurized oil wells, degassing station station location, topography, geomorphology, choose a rational move toward, and strive to line shun has been shortened, line length, savings and investment steel;
  • 匿名
2013-05-23 12:24:58
The line trend unifies the oil well, the degasification station, the pressurizing point geographical position, the terrain, the landform, the choice reasonable trend, makes every effort the line to be suitable straight, reduces the line length, saves the steel products and the investment;
  • 匿名
2013-05-23 12:26:38
Alignments, combined with oil wells and degassing stations, pressuring station location, topography, geomorphology, selecting the right trend, strive to achieve a line straight to shorten the line length, save steel and investments;
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭