求翻译:The costs of civil works are calculated based on the quantities of materials and unit prices. The unit prices are based on the actual project conditions and the assumed sources of labor, materials and construction machinery. The unit prices of the equipment such as electro-mechanical equipment, hydraulic equipment and 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The costs of civil works are calculated based on the quantities of materials and unit prices. The unit prices are based on the actual project conditions and the assumed sources of labor, materials and construction machinery. The unit prices of the equipment such as electro-mechanical equipment, hydraulic equipment and
问题补充:

  • 匿名
2013-05-23 12:21:38
土建工程的费用是基于材料的数量和单位价格计算。单位价格是根据实际项目的条件和劳动力,材料和施工机械的假设来源。如机电设备,液压设备和传输系统的设备单位价格基础上的制造商。金融项目成本计算的基础上的直接成本,物理应变,利润,税收,管理和工程费。
  • 匿名
2013-05-23 12:23:18
土木工程的费用的计算是根据材料的数量和单位价格。 该股价格是基于实际的项目的条件和假定的劳工来源、材料及建筑机器。 该股的价格的设备,例如机电设备、液压设备和传送系统所根据的制造商。 项目的财政费用的计算是根据直接费用、身体应变、溢利、税务、管理和工程费用。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
土建工程的费用是根据大量的材料和单位价格计算的。单位价格根据项目实际条件和劳动、 材料和工程机械的假定的来源。机电一体化设备、 液压设备和传输系统等设备的单位价格基于制造商。金融工程费用是根据计算直接成本、 物理应急、 利润、 税收、 管理和工程费用。