当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:已派供应商对此批的料件进行修理,后续IQC、IPQC对新进料件先在线下进行适配,检验,合格后方可安排上线生产是什么意思?

待解决 悬赏分:1 - 离问题结束还有
已派供应商对此批的料件进行修理,后续IQC、IPQC对新进料件先在线下进行适配,检验,合格后方可安排上线生产
问题补充:

  • 匿名
2013-05-23 12:21:38
This supplier has sent batches of materials and parts for repair, follow-up IQC, IPQC New materials and parts for under the first-line adaptation, testing, after passing arrangements on-line production
  • 匿名
2013-05-23 12:23:18
This batch has been sent to suppliers of materials and parts for repairs, and follow-up to 10-55IQC IPQC materials and parts, first in line for the adapter to test and pass on the line for production
  • 匿名
2013-05-23 12:24:58
Has sent the material which the supplier approves regarding this to carry on the repair, following IQC, IPQC online under carry on first to new feeding adaptive, the examination, after the qualified side may arrange the political line production
  • 匿名
2013-05-23 12:26:38
Vendor materials for repairs to this batch, follow-up IQC, IPQC on adaptation under the new feed to online to test, after passing can be arranged on-line production
  • 匿名
2013-05-23 12:28:18
Send supplier material piece in this batch go on repair already, subsequent IQC, IPQC to feed piece carry on right to buy under being first online newly, test, qualified rear can arrange production of reaching the standard grade
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭