当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:优化了华能海门电厂1 036 MW机组汽动引风机的全程控制策略,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
优化了华能海门电厂1 036 MW机组汽动引风机的全程控制策略,
问题补充:

  • 匿名
2013-05-23 12:21:38
Optimized Huaneng Haimen Power Plant 1 036 MW unit of the whole steam-driven fan control strategy,
  • 匿名
2013-05-23 12:23:18
The Huaneng Power plant optimization of 1,036 moors MW crew motor interactive wind machine's full-control strategies.
  • 匿名
2013-05-23 12:24:58
Optimized China to be able the Haimen power plant 1 036 MW unit steam to move the drawing fan the entire journey control strategy,
  • 匿名
2013-05-23 12:26:38
Optimized 1 036 MW generating unit in Huaneng haimen power plant steam-driven global control strategy of induced draft fan,
  • 匿名
2013-05-23 12:28:18
Have optimized the whole control strategy that Haimen power plant 1 036 MW unit vapour of Huaneng Group moves the air-introduced machine,
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭