当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在华侨大学FSAE车队团队中担任总布置人员,负责整车的设计,零部件设计以及加工和整车装配的全过程,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在华侨大学FSAE车队团队中担任总布置人员,负责整车的设计,零部件设计以及加工和整车装配的全过程,
问题补充:

  • 匿名
2013-05-23 12:21:38
Huaqiao University FSAE team in the team as general layout staff, is responsible for vehicle design, vehicle parts and assembly design, and processing the whole process,
  • 匿名
2013-05-23 12:23:18
The Overseas Chinese University team in FSAE fleet served as staff members, is responsible for overall layout design, the whole car parts design and processing and assembling the car in the entire process.
  • 匿名
2013-05-23 12:24:58
Holds the post in the overseas Chinese university FSAE motorcade team always arranges the personnel, is responsible for the entire vehicle the design, the entire process which the spare part design as well as the processing and the entire vehicle assemble,
  • 匿名
2013-05-23 12:26:38
Huaqiao University FSAE team served as the General layout of personnel in the team, is responsible for the design of vehicle, car Assembly and parts design and manufacture of the entire process,
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭