当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:- Performed preliminary stress evaluated calculation and finalized piping route. Reviewed piping material specifications for valves, expansion joints, strainers, pipe supports, anchors, etc. Checked and Reviewed piping layouts and isometric drawings to comply with codes, regulations and standards for oil pipeline, term是什么意思?

待解决 悬赏分:1 - 离问题结束还有
- Performed preliminary stress evaluated calculation and finalized piping route. Reviewed piping material specifications for valves, expansion joints, strainers, pipe supports, anchors, etc. Checked and Reviewed piping layouts and isometric drawings to comply with codes, regulations and standards for oil pipeline, term
问题补充:

  • 匿名
2013-05-23 12:21:38
- 演出初步应力评估计算,并最终确定管道路线。评论的管道阀门,伸缩缝,过滤器,管道支架,锚等材料规格管道布局和等距的图纸,遵守法规,规章和标准,石油管道,终端水箱和水泵facilites检查和审核。
  • 匿名
2013-05-23 12:23:18
-进行初步强调评价和最后确定计算管道路线。 审查了管道材料规格的阀门、扩大关节、滤器、喉管支持、锚,等等。 检查和审查了管道布局和等距绘图,遵守法规、规章和标准的石油管道、坦克和泵站设施。
  • 匿名
2013-05-23 12:24:58
-执行的初步重音被评估的演算和被完成的管道系统路线。 阀门、伸缩接头、过滤器、管架、船锚等等的被回顾的管道系统的原材料明细表。 被检查的和被回顾的管道系统的布局和等角图依从代码、章程和标准为输油管,终端坦克和泵浦facilites。
  • 匿名
2013-05-23 12:26:38
-执行初步应力计算计算并完成管道路由。审查管道材料规格的阀门、 伸缩缝、 过滤器、 管道支持、 锚等。检查和审查的管道布局和测图遵守守则、 条例和石油管道、 终端坦克和泵设施标准。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭