当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本文结合隧道进口段堆积体的施工特点,有效的形成“U”字型帷幕,保证了地表注浆及管棚的施工质量;并考虑地表注浆及管棚施工对围岩的综合效应,对设计进行优化,合理的安排施工顺序,为进洞施工争取了时间。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本文结合隧道进口段堆积体的施工特点,有效的形成“U”字型帷幕,保证了地表注浆及管棚的施工质量;并考虑地表注浆及管棚施工对围岩的综合效应,对设计进行优化,合理的安排施工顺序,为进洞施工争取了时间。
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
This article combines piled up paragraph imports tunnel construction features of the formation, effectively "U Shaped curtain and ensure that the surface note pulp and pipe scaffolding; and to consider the quality of construction and tube surface note pulp scaffolding works to rock the combined effe
  • 匿名
2013-05-23 12:24:58
This article unifies the tunnel inducer to pile up the body the construction characteristic, the effective formation “U” the font curtain, has guaranteed the surface note thick liquid and the tube awning construction quality; And considered the surface note thick liquid and the tube awning construct
  • 匿名
2013-05-23 12:26:38
Combining the character of accumulation body construction of tunnel entrance section of this article, effectively form a "u"-shaped curtain to ensure construction quality of ground grouting and pipe-shed; surface grouting and pipe-shed and taking into account the integrated effects of construction o
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭