当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:防渗墙工程的质量检查主要是:工序检查和墙体质量检查。工序质量检查在施工过程中进行,墙体质量检查在成墙后抽查。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
防渗墙工程的质量检查主要是:工序检查和墙体质量检查。工序质量检查在施工过程中进行,墙体质量检查在成墙后抽查。
问题补充:

  • 匿名
2013-05-23 12:21:38
Impervious wall quality check is mainly: processes checks and wall quality assurance checks. Process quality inspection during construction, wall quality spot checks after the wall.
  • 匿名
2013-05-23 12:23:18
Check the quality of the works impermeable wall is mainly: process check and wall quality checks. In the course of construction quality inspection processes, wall after wall in random quality checks.
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
Impervious wall quality check is mainly: processes checks and wall quality assurance checks. Process quality inspection during construction, wall quality spot checks after the wall.
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭