当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:At anytime, and from time to time,after termination GNOPC may give notice to the contractor specifying items of materials, plant and contractor's equipment which are no longer required for the completion of the works and which will be released to the contractor at or near the worksite.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
At anytime, and from time to time,after termination GNOPC may give notice to the contractor specifying items of materials, plant and contractor's equipment which are no longer required for the completion of the works and which will be released to the contractor at or near the worksite.
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
在任何时候和时常,在终止GNOPC也许给通知指定为工作完成不再需要,并且将被发布给承包商在或者靠近工地材料、植物和承包商的设备之后的项目承包商。
  • 匿名
2013-05-23 12:26:38
在任何时候,和终止后,不时 GNOPC 可指定的项目的材料、 装置和承包商的设备,不再需要完成的工程和,将该承建商或工地附近发表该承建商发出通知。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭