求翻译:装置安装完毕后外接管道需进行打压试验。各管道、阀门的连接处无泄漏方为合格。试验方法参照国家相关标准中有关规定执行。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
装置安装完毕后外接管道需进行打压试验。各管道、阀门的连接处无泄漏方为合格。试验方法参照国家相关标准中有关规定执行。
问题补充:

  • 匿名
2013-05-23 12:21:38
Outside the device after installation to take over road, a pressure test is required. Pipe, valve at the connection of leak-free party is qualified. Test method for reference the relevant provisions of national standards.
  • 匿名
2013-05-23 12:23:18
After the installation is complete, road devices required for taking over a pressure test. All piping, valves, there is no leakage of connections to qualified parties. In reference to the state method of testing the relevant provisions of the relevant standards.
  • 匿名
2013-05-23 12:24:58
After the installment installment finished outside meets the pipeline to have to carry on hits the pressure test.Various pipelines, valve attachment point non-divulging side for qualified.In testing method reference country correlation standard related stipulation execution.
  • 匿名
2013-05-23 12:26:38
Outside the device after installation to take over road, a pressure test is required. Pipe, valve at the connection of leak-free party is qualified. Test method for reference the relevant provisions of national standards.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 