当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:防汛指挥系统、雨洪预警系统、防汛预案编制等非工程措施也不断完善。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
防汛指挥系统、雨洪预警系统、防汛预案编制等非工程措施也不断完善。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Flood control and command systems, rain flood warning systems, flood prevention and early warning case non-engineering measures such as preparation is also continuing to improve.
  • 匿名
2013-05-23 12:24:58
The flood prevention command system, the rain Hong early warning system, the flood prevention predetermined plan establishment and so on the non-project measure also unceasingly consummates.
  • 匿名
2013-05-23 12:26:38
Flood control command system, rain and flood early warning system, the flood control plan for establishment of non-engineering measures are continuously improved.
  • 匿名
2013-05-23 12:28:18
Flood control command system, rain and flood early warning system, the flood control plan for establishment of non-engineering measures are continuously improved.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭