求翻译:印尼大丰港镍铁项目自备电厂工程远期规模为4x50MW湿冷燃煤发电机组,机组不向电网送电,本期规模为4x50MW。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
印尼大丰港镍铁项目自备电厂工程远期规模为4x50MW湿冷燃煤发电机组,机组不向电网送电,本期规模为4x50MW。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
indonesian Tai Fung Hong Kong-owned power plant project nickel rail projects forward size is 4 x 50 MW wet cold coal-fired units, units, and not to send power to the grid size is 4x 50 MW.
  • 匿名
2013-05-23 12:24:58
The Indonesian Dafeng Port ferro-nickel iron project supplies for oneself the power plant project forward scale is the 4x50MW wet cold coal-burning power set, the unit not to the electrical network power transmission, this issue of scale is 4x50MW.
  • 匿名
2013-05-23 12:26:38
Dafeng nickel-iron project in Hong Kong-owned power plant project in Indonesia long term scale of 4x50MW raw coal-fired power generating units, units not to power transmission, size of 4x50MW for the current period.