求翻译:辽宁红沿河核电站部分地下构筑物连续两个夏季都出现了不同程度的结露问题,严重影响了施工质量,又阻碍了后续的施工进展。经过深入分析讨论,本文分析归纳了此问题产生的原因,并明确了相应的处理方案。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
辽宁红沿河核电站部分地下构筑物连续两个夏季都出现了不同程度的结露问题,严重影响了施工质量,又阻碍了后续的施工进展。经过深入分析讨论,本文分析归纳了此问题产生的原因,并明确了相应的处理方案。
问题补充:

  • 匿名
2013-05-23 12:21:38
Liaoning Hongyan River Nuclear Power Plant section of the underground structures of two consecutive summer have suffered different degrees of condensation, which seriously affected the quality of construction, but also hindered the subsequent construction progress. After in-depth analysis and discus
  • 匿名
2013-05-23 12:23:18
Liaoning's red river nuclear power plant parts of underground structures, there have been two consecutive summer different degrees of dew, and serious impact on the quality of construction has hindered the construction progress follow-up. After an in-depth analysis, analysis of this paper discusses
  • 匿名
2013-05-23 12:24:58
The Liaoning red along the river nuclear power station part underground construction continual two summers all had the varying degree condensation problem, has affected the construction quality seriously, also has hindered the following construction progress.After the thorough analysis discussion, t
  • 匿名
2013-05-23 12:26:38
Some underground structure in Liaoning Red River nuclear power plant in two consecutive summer suffered different degrees of condensation problems, seriously affecting the quality of construction, and hinder the construction of subsequent progress. After extensive analysis, this article analyses sum
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 