求翻译:SSBA表示6号装修单位在车间东部搭设满堂脚手架,我方要求MCC务必在此前完成对车间设备基础不合格处的整改,包括涨模,漏浆等。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
SSBA表示6号装修单位在车间东部搭设满堂脚手架,我方要求MCC务必在此前完成对车间设备基础不合格处的整改,包括涨模,漏浆等。
问题补充:

  • 匿名
2013-05-23 12:21:38
SSBA said decoration unit 6 puts up the full house in the eastern part of the workshop scaffolding, our request MCC must be completed in the previous basis of workshop equipment failure at the rectification, including up model, drain pulp.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
SSBA expressed 6 repair units put up the full house scaffold east the workshop, we request MCC before this to complete by all means must to workshop equipment foundation unqualified place reorganizing, including rises the mold, leaks the thick liquid and so on.
  • 匿名
2013-05-23 12:26:38
SSBA decorated flat at 6th in the eastern part of the workshop setting with full scaffold, we claim a MCC be sure to complete the rectification and reform at the workshop equipment is not eligible, including rose die, leakage and so on.
  • 匿名
2013-05-23 12:28:18
SSBA decorated flat at 6th in the eastern part of the workshop setting with full scaffold, we claim a MCC be sure to complete the rectification and reform at the workshop equipment is not eligible, including rose die, leakage and so on.
 
 