当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:3.4.5 治工具零組件納入後,進行組裝、調適、配置電氣管路後交由工程或新產品單位驗證。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3.4.5 治工具零組件納入後,進行組裝、調適、配置電氣管路後交由工程或新產品單位驗證。
问题补充:

  • 匿名
2013-05-23 12:21:38
3.4.5 Governance tools include retail components, the conduct assembly, adjustment, configuration, electrical piping, or after a new product by the engineering unit verification.
  • 匿名
2013-05-23 12:23:18
3.4 5 analysis tools components into, assembled, adaptability, configuration electrical lines for engineering or products unit check HSBC.
  • 匿名
2013-05-23 12:24:58
After 3.4.5 governs the tool 零 module to integrate, after enters 行 the assembly, the adjustment, the disposition electricity tube 路 hands over by the project or the new output unit confirms.
  • 匿名
2013-05-23 12:26:38
3.4.5 administration tools after zero components into, do Assembly, adjustment, electric pipe after Shan Road referred to the project or new product unit of configuration validation.
  • 匿名
2013-05-23 12:28:18
3.4.5 治工具零组件纳入后,进行组装、调适、配置电气管路后交由工程或新产品单位验证。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭