当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:禁止用易燃液体、冬季施工必须做好防爆工作。供热前,必须经技术、安全、设备等部门检查合格,方可使用。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
禁止用易燃液体、冬季施工必须做好防爆工作。供热前,必须经技术、安全、设备等部门检查合格,方可使用。
问题补充:

  • 匿名
2013-05-23 12:21:38
Winter construction of prohibited use flammable liquids, must do a good job explosion-proof. Before heating, must be approved by the technical, security, equipment, and other departments to check conformity, may be used.
  • 匿名
2013-05-23 12:23:18
prohibition on use of inflammable liquid, winter blast construction work must be done, and done well. Heat before it is technical, safety, equipment, and other departments to make inspection conducted by a qualified.
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Winter construction of prohibited use flammable liquids, must do a good job explosion-proof. Before heating, must be approved by the technical, security, equipment, and other departments to check conformity, may be used.
  • 匿名
2013-05-23 12:28:18
Winter construction of prohibited use flammable liquids, must do a good job explosion-proof. Before heating, must be approved by the technical, security, equipment, and other departments to check conformity, may be used.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭