|
关注:1
2013-05-23 12:21
求翻译:This procedure defines the minimum requirement for the installation, corrosion protection and insulation of static equipment, and prefabrication, installation, corrosion protection, insulation of atmospheric storage tanks. This work shall be done by installation engineer in conjunction with vendor’s representative wher是什么意思? 待解决
悬赏分:1
- 离问题结束还有
This procedure defines the minimum requirement for the installation, corrosion protection and insulation of static equipment, and prefabrication, installation, corrosion protection, insulation of atmospheric storage tanks. This work shall be done by installation engineer in conjunction with vendor’s representative wher
问题补充: |
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区