求翻译:there are existing seconds-order or higher base points in Pakse.Pakxong,and attapeu.however,even the closest base point in Pakxong is some 35km away from the site,indicating that there may be some problems on the accuracy of the maps to be produced if the base point in Pakxong was used for mapping.hence,the base point 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
there are existing seconds-order or higher base points in Pakse.Pakxong,and attapeu.however,even the closest base point in Pakxong is some 35km away from the site,indicating that there may be some problems on the accuracy of the maps to be produced if the base point in Pakxong was used for mapping.hence,the base point
问题补充:

  • 匿名
2013-05-23 12:21:38
有现有秒阶或更高的基点在Pakse.Pakxong,并attapeu.however,即使是在Pakxong最密切的基点是一些35公里远离的网站,表明可能存在一些问题,对地图的准确性生产,如果在Pakxong基点使用mapping.hence,Nougphanouan班和班Nongmek.which的基准点位于工地附近的地面找平调查,在班Noungphanouan基点是第二顺序控制由国家地理部(NGD),并提供网站的东南约15公里点
  • 匿名
2013-05-23 12:23:18
(副) 在那里; 向那里; 到那里; 在那时   (感叹) 你瞧; 喂; 好啦
  • 匿名
2013-05-23 12:24:58
有现有的秒钟秩序或更高的基本的点在Pakse.Pakxong和attapeu.however,甚而最接近的基本的点在Pakxong是一些35km从站点,表明在将被生产的地图的准确性在禁令Nougphanouan也许有有些问题,如果基本的点在Pakxong为mapping.hence使用了,基本的点,并且禁令Nongmek.which在站点附近位于,为地面成水平的勘测使用,基本的点在禁令Noungphanouan是全国地理部门(NGD)和被找出的大约15km提供的第二级次的控制点东南从站点
  • 匿名
2013-05-23 12:26:38
有现有秒订单或工地附近设高基点在 Pakse.Pakxong,and attapeu.however,even Pakxong 在最近的基准点是约 35 公里的站点,该值指示如果 Pakxong 的基准点用于禁止 Nougphanouan 和禁止 Nongmek.which mapping.hence,the 基点制作地图的准确性可能有几个问题用于地面水准测量、 禁止 Noungphanouan 的基准点是提供由国家地理署 (NGD) 和位于站点东南约 15 公里的二阶控制点
  • 匿名
2013-05-23 12:28:18
有现有秒订单或工地附近设高基点在 Pakse.Pakxong,and attapeu.however,even Pakxong 在最近的基准点是约 35 公里的站点,该值指示如果 Pakxong 的基准点用于禁止 Nougphanouan 和禁止 Nongmek.which mapping.hence,the 基点制作地图的准确性可能有几个问题用于地面水准测量、 禁止 Noungphanouan 的基准点是提供由国家地理署 (NGD) 和位于站点东南约 15 公里的二阶控制点
 
 