|
关注:1
2013-05-23 12:21
求翻译:existing topographic maps available for the site are of 1:100:000 and 1:50,000 scale,of which interval of counter line is more than 20m.it is necessary to produce more detailed maps for the preliminary design and alternative layouts of the project accordingly是什么意思?![]() ![]() existing topographic maps available for the site are of 1:100:000 and 1:50,000 scale,of which interval of counter line is more than 20m.it is necessary to produce more detailed maps for the preliminary design and alternative layouts of the project accordingly
问题补充: |
|
2013-05-23 12:21:38
现有的网站提供的地形图是1:100:000是必要的初步设计和项目相应的替代布局更详细的地图比例为1:50,000,其中反线的间隔比20m.it
|
|
2013-05-23 12:23:18
现有地形地图可对该幅土地的是1:100:000和1:5万规模,其中间隔的柜位线是20多米。有必要编制更详细的地图和初步设计替代布置的相应的项目
|
|
2013-05-23 12:24:58
现有的地形图可利用为站点是1:100 :000和1:50,000标度,其中间隔时间逆线比20m.it是更多是必要相应地生产更加详细的地图为项目的初步设计和供选择的布局
|
|
2013-05-23 12:26:38
地形图现有可供网站 1:100:000 和 1:50,000 的规模、 时间间隔计数器的线是比 20m.it 有必要产生的更多详细地图的初步设计和布置方案项目的相应
|
|
2013-05-23 12:28:18
地形图现有可供网站 1:100:000 和 1:50,000 的规模、 时间间隔计数器的线是比 20m.it 有必要产生的更多详细地图的初步设计和布置方案项目的相应
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区