当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Xeset 2 hydropower station is under construction and expected to be linked with the southern grid in 2009.Xekaman 3 is under constructed by Vietnamese side.there is an agreement between Lao PDR and Vietnamese related party to supply power to Sekong town to contribute rural electrification and socio-economic development是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Xeset 2 hydropower station is under construction and expected to be linked with the southern grid in 2009.Xekaman 3 is under constructed by Vietnamese side.there is an agreement between Lao PDR and Vietnamese related party to supply power to Sekong town to contribute rural electrification and socio-economic development
问题补充:

  • 匿名
2013-05-23 12:21:38
Xeset 2水电站正在建设中,预计将与南方电网在3 2009.Xekaman挂钩,在由越南side.there兴建是老挝和越南的关联方之间的协议,供电色贡镇有助于农村电气化和在南部地区的社会经济发展
  • 匿名
2013-05-23 12:23:18
2xeset水力发电站正在兴建中及预期将在2009年与南部电网。xekaman3是根据建造的越南方面。有协议老挝人民民主共和国和越南有关方提供电力,即阿速坡镇,有助于农村电气化和社会-经济发展在南部地区
  • 匿名
2013-05-23 12:24:58
Xeset 2水力发电驻地是建设中,并且准备与南部的栅格连接在2009.Xekaman 3下由越南side.there在南部的区域修建是一个协议在老挝人PDR和越南相关党之间到供应力量对Sekong镇贡献农村电化和社会经济的发展
  • 匿名
2013-05-23 12:26:38
Xeset 2 水电站正在施工,预期将与南部 2009.Xekaman 3 中的网格下越南人通过构建的 side.there 是一个老挝之间的协议,越南与相关方对供电公河镇农村电气化和南部地区的社会经济发展作出贡献
  • 匿名
2013-05-23 12:28:18
Xeset 2 水电站正在施工,预期将与南部 2009.Xekaman 3 中的网格下越南人通过构建的 side.there 是一个老挝之间的协议,越南与相关方对供电公河镇农村电气化和南部地区的社会经济发展作出贡献
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭