|
关注:1
2013-05-23 12:21
求翻译:(2)变量非连续性,由于规划约束变量的特点,规划变量经常是0~1整数变量或者是离散变量,或者是变量值都是已经给定的离散方案取值;是什么意思? 待解决
悬赏分:1
- 离问题结束还有
(2)变量非连续性,由于规划约束变量的特点,规划变量经常是0~1整数变量或者是离散变量,或者是变量值都是已经给定的离散方案取值;
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
( 2) variables bound by non-continuity of planning, as a result, the planning features of a variable variables are often 0 ~ 1 integer variables or as discrete variables, or the value of the variable is has been given for the reunion program value;
|
|
2013-05-23 12:24:58
(2) variable non-continuity, as a result of the plan restraint variable characteristic, the plan variable was frequently 0~1 integer variables or is separated the variable, or is the separate plan value which the variable value all was already assigns;
|
|
2013-05-23 12:26:38
(2) the variable non-continuity planning characteristics of bound variables, planning variables are often 0~1 or integer variables are discrete variables, or the value of the variable is discrete programmes has given value;
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区