当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:签订本合同后,甲方不得擅自变更该房屋的建筑设计(见附件二),确需变更的应当征得乙方书面同意并报规划管理部门审核批准,在获得批准之日起30天内与乙方签订本合同变更协议。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
签订本合同后,甲方不得擅自变更该房屋的建筑设计(见附件二),确需变更的应当征得乙方书面同意并报规划管理部门审核批准,在获得批准之日起30天内与乙方签订本合同变更协议。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
After entering into this Contract, Party A shall not be arbitrarily changed the housing of architectural design (see annex 2) and should be modified, must be conducted with the consent, Party B written consent and approval planning management departments, the approval is given within 30 days of the
  • 匿名
2013-05-23 12:24:58
After signs this contract, the party of the first part does not have to change this house the architectural design (to see appendix arbitrarily two), must change firmly must win the second party written approval and the newspaper plan control section verifies the authorization, in obtains in authori
  • 匿名
2013-05-23 12:26:38
After entering into this contract, party a will be allowed to change the architectural design of the housing (see annex II), really necessary changes should be written consent and the consent of the party planning management departments approved approved within 30 days from the date of the contracts
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭