当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:工地停工,必须提前报知工程部巡检,或工程部经理,停电、停水、无法施工,应及时报知工程部是什么意思?

待解决 悬赏分:1 - 离问题结束还有
工地停工,必须提前报知工程部巡检,或工程部经理,停电、停水、无法施工,应及时报知工程部
问题补充:

  • 匿名
2013-05-23 12:21:38
Site downtime must be reported to Engineering Department inspection in advance, or project manager, power, water supply, could not be implemented, and the Times know that engineering should be
  • 匿名
2013-05-23 12:23:18
Site downtime must be made in advance notification Engineering Department, or engineering manager Byeolsungeom, electricity, water, unable to work, and it would be timely to known works department
  • 匿名
2013-05-23 12:24:58
The work site shuts down, must inform the engineering dept to inspect ahead of time, or engineering dept manager, the power cut, cuts off the water supply, is unable to construct, should inform the engineering dept promptly
  • 匿名
2013-05-23 12:26:38
Site downtime, must be reported in advance engineering inspection, or Engineering Manager, power outage, suspension, not construction, should promptly report engineering
  • 匿名
2013-05-23 12:28:18
Site downtime must be reported to Engineering Department inspection in advance, or project manager, power, water supply, could not be implemented, and the Times know that engineering should be
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭