当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Before the launch of the Shenzhou-8 spacecraft, Tiangong-1 will have to adjust its flight path to match that of Shenzhou-8. They must be flying at the same altitude and at nearly the same speed. During the initial phase, ground control will be in charge, but as the two crafts come closer together, an automatic pilot wi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Before the launch of the Shenzhou-8 spacecraft, Tiangong-1 will have to adjust its flight path to match that of Shenzhou-8. They must be flying at the same altitude and at nearly the same speed. During the initial phase, ground control will be in charge, but as the two crafts come closer together, an automatic pilot wi
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
在推出「神舟8号飞船,天公-1将必须调整其飞行路径以匹配,神舟8。 他们必须在同一高度飞行,在将近相同的速度。 在初期阶段,地面控制将负责,因为两项工艺更加密切地团结在一起,一个自动试验将接管。
  • 匿名
2013-05-23 12:24:58
在Shenzhou-8航天器, Tiangong-1的发射将必须对比赛调整它的飞行路径Shenzhou-8之前。 他们一定几乎飞行在同一高度和以同一速度。 在初期阶段期间,地面控制将是负责的,但是,当二种工艺一起来更加紧密,自动飞行将接管。
  • 匿名
2013-05-23 12:26:38
神舟 8 航天器的发射前, 天工-1 将不得不调整其飞行轨迹与神舟 8 的相匹配。他们必须在飞行在同一高度,以几乎相同的速度。在初始阶段,地面控制将负责,但由于两种工艺在一起更紧密,自动驾驶仪将接管。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭