当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:塔架的下端设置有货车通道,控制室设置在塔架的货车通道的侧面,在塔架的顶端设置有皮带运输机的机头并其输出口与缓冲仓相连,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
塔架的下端设置有货车通道,控制室设置在塔架的货车通道的侧面,在塔架的顶端设置有皮带运输机的机头并其输出口与缓冲仓相连,
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
The pylon set foot in a goods vehicle lanes, and control room settings in the pylon in the trucks in profile, the pylon settings are the top belt conveyer of machine head and its exports Exports linked with buffer positions.
  • 匿名
2013-05-23 12:24:58
The tower lower extremity establishment has the wagon way, the control room establishes in the tower wagon way side, has the belt conveyer nose and its outlet and the cushion warehouse in the tower peak establishment is connected,
  • 匿名
2013-05-23 12:26:38
Bottom of the Tower sets the trucks channel, control room set up in the Tower of the truck side of the channel, set at the top of the Tower belt conveyor head and connected to its output and the buffer silos,
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭