当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:并用调整楔铁及顶丝将传动座架夹紧在与活动框架的传动轴托架上,检查活动框架顶面的标高尺寸H,并做必要调整。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
并用调整楔铁及顶丝将传动座架夹紧在与活动框架的传动轴托架上,检查活动框架顶面的标高尺寸H,并做必要调整。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Wedge adjustment and rail and top population will drive block, fastening structure in the framework of the activities, check the Transmission Shaft bracket at elevation top face size H framework activities, and to do the necessary adjustments.
  • 匿名
2013-05-23 12:24:58
And with the adjusting wedge iron and the set screw the transmission seat frame clamp in with on the active frame drive shaft bracket, inspection frame top elevation size H, and makes the essential adjustment.
  • 匿名
2013-05-23 12:26:38
Adjusting wedge and the top wire clamping in the transmission drive shaft bracket frame with the activity, active frame top elevation of size h, and do necessary adjustments.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭