当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:减压器装好后,操作者应站在瓶阀的侧后面将调节螺丝拧松,缓慢开启气瓶阀门。停止工作时,应关闭气瓶阀门,拧松减压器调节螺丝,放出软管中的余气,最后卸下减压器。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
减压器装好后,操作者应站在瓶阀的侧后面将调节螺丝拧松,缓慢开启气瓶阀门。停止工作时,应关闭气瓶阀门,拧松减压器调节螺丝,放出软管中的余气,最后卸下减压器。
问题补充:

  • 匿名
2013-05-23 12:21:38
Pressure reducer loading is completed, the operator should stand in the back side of the cylinder valve adjustment screw loose to slowly open the gas cylinder valve. When they stop working, gas cylinder valves should be closed, loosen regulator adjusting screw, emitting the gas hose, finally removin
  • 匿名
2013-05-23 12:23:18
After pressure reducer is installed, the operator should stand behind the bottle valve will regulate the side screw pine, slowly opened, cylinder valve. cessation of work, should be shut off gas cylinders, valves, pressure reducer is adjusting screw pines and emit a residual gas hose, and finally un
  • 匿名
2013-05-23 12:24:58
After the reductor installs, the operator will be supposed to stand in the bottle valve rear surface the adjusting screw twists the pine, opens the air bottle valve slowly.When knock off, should close the air bottle valve, twists the loose reductor adjusting screw, in the outlet hose residual gas, f
  • 匿名
2013-05-23 12:26:38
Pressure reducer loading is completed, the operator should stand in the back side of the cylinder valve adjustment screw loose to slowly open the gas cylinder valve. When they stop working, gas cylinder valves should be closed, loosen regulator adjusting screw, emitting the gas hose, finally removin
  • 匿名
2013-05-23 12:28:18
Pressure reducer loading is completed, the operator should stand in the back side of the cylinder valve adjustment screw loose to slowly open the gas cylinder valve. When they stop working, gas cylinder valves should be closed, loosen regulator adjusting screw, emitting the gas hose, finally removin
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭