当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Since actual manufacturing costs are charged to the manufacturing overhead control account rather than work in process account. How are manufacturing costs assigned to work in process? The answer is, by means of the predetermined overhead rate. A predetermined overhead rate is established at the beginning of each year.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Since actual manufacturing costs are charged to the manufacturing overhead control account rather than work in process account. How are manufacturing costs assigned to work in process? The answer is, by means of the predetermined overhead rate. A predetermined overhead rate is established at the beginning of each year.
问题补充:

  • 匿名
2013-05-23 12:21:38
由于实际生产成本制造费用控制帐户中扣除,而不是在进程帐户的工作。如何制造工作分配过程中的成本?答案是,通过预定的开销率。是建立在每年年初预定的开销率。预定的开销率计算预计总单位在分配基础(机器小时,直接人工小时,或其他一些基础测量)除以一年的开销估计总制造成本。然后,这个比率是用来申请工作的开销费用。
  • 匿名
2013-05-23 12:23:18
因为实际制造成本均在制造间接成本控制帐户,而不是在工作进程帐户。 制造成本是如何分配的工作是在进程? 答案是,预定管理手段的速度。 设立了一个预定管理率是每年的开始。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
由于实际制造成本收费是制造开销控制帐户而不是工作进程帐户。工作过程中,制造成本如何分配?答案是,预定架空率的手段。按预定的架空速率是每年年初成立。预定架空率是年制造费用估计的总数除以的估计总单位分配基 (机器工时、 直接劳动时间或一些其他基地以衡量)。%E
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭