求翻译:主坝填筑施工时根据工作面的变化,修建支道到各个工作面。是什么意思? 待解决
悬赏分:1
- 离问题结束还有
主坝填筑施工时根据工作面的变化,修建支道到各个工作面。
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
Reclamation main dam construction evolves in accordance with the changes in road construction to support various roadways.
|
|
2013-05-23 12:24:58
When main dam reclamation construction acts according to the working surface the change, a construction road to each working surface.
|
|
2013-05-23 12:26:38
As faces change when filling construction of main dam, construction of a road to the face.
|
|
2013-05-23 12:28:18
As faces change when filling construction of main dam, construction of a road to the face.
|