当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:安装:通常是用螺丝压板和千斤顶压入的方法,用起重葫芦将尾轴承送入轴管中,装妥导向杆,找正原来记号,当配合直径开始接触时,装妥压入工具,压入时配合表面必须加润滑剂,整个圆周均匀压入, 压入后装好固定装置,如果是铁犁木尾轴应清洁干净,涂上一层黄油, 以防干裂。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
安装:通常是用螺丝压板和千斤顶压入的方法,用起重葫芦将尾轴承送入轴管中,装妥导向杆,找正原来记号,当配合直径开始接触时,装妥压入工具,压入时配合表面必须加润滑剂,整个圆周均匀压入, 压入后装好固定装置,如果是铁犁木尾轴应清洁干净,涂上一层黄油, 以防干裂。
问题补充:

  • 匿名
2013-05-23 12:21:38
Installed: usually is with screws plate and Jack pressure into of method, with lifting hyacinth will tail bearing into axis tube in the, loading due oriented rod, found are original mark, dang combined with diameter began contact Shi, loading due pressure into tools, pressure when combined with surf
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Installment: Usually is the method which presses in with the screw clamp and the hoisting jack, with lifts heavy objects the bottle gourd to send in the tail bearing in the shaft tube, loaded properly the steering bar, adjusts the original symbol, when the coordinate diameter starts contacts, loaded
  • 匿名
2013-05-23 12:26:38
Installed: usually is with screws plate and Jack pressure into of method, with lifting hyacinth will tail bearing into axis tube in the, loading due oriented rod, found are original mark, dang combined with diameter began contact Shi, loading due pressure into tools, pressure when combined with surf
  • 匿名
2013-05-23 12:28:18
Installed: usually is with screws plate and Jack pressure into of method, with lifting hyacinth will tail bearing into axis tube in the, loading due oriented rod, found are original mark, dang combined with diameter began contact Shi, loading due pressure into tools, pressure when combined with surf
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭