当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:此时就需要在过热器前设置一个启动旁路系统来将多余的水排掉。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
此时就需要在过热器前设置一个启动旁路系统来将多余的水排掉。
问题补充:

  • 匿名
2013-05-23 12:21:38
At this point you need to set a start before the superheater bypass system to drain excess water.
  • 匿名
2013-05-23 12:23:18
If that happens, it would need to be set up before the superheater a startup 10,129 systems to be excess water off.
  • 匿名
2013-05-23 12:24:58
This time will need to establish a start by-path in front of the superheater to come the unnecessary water platoon to fall.
  • 匿名
2013-05-23 12:26:38
At this point you need to set a start before superheater bypass system to drain excess water.
  • 匿名
2013-05-23 12:28:18
At this point you need to set a start before the superheater bypass system to drain excess water.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭