当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:如图1所示位于八一立交桥附近的××桩基础工程,属济南地区较为典型的山前冲洪积地层,桩径600mm,桩长18m左右,平均单桩施工时间超过24小时。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
如图1所示位于八一立交桥附近的××桩基础工程,属济南地区较为典型的山前冲洪积地层,桩径600mm,桩长18m左右,平均单桩施工时间超过24小时。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
As shown in Figure 1 is located near the overpass 81 × ×pile foundation works, Jinan area is a typical example of Yamasaki hedge Hongji stratigraphy, piles, pile diameter 600mm long, with an average around 18 m single-pile construction time more than 24 hours.
  • 匿名
2013-05-23 12:24:58
As shown in Figure 1 is located nearby 81 multi-level crossing bridges ×× the pile foundation project, is in front of a Jinan area more typical mountain to flush Hong to accumulate the stratum, pile diameter 600mm, about pile long 18m, the average single pile construction time surpasses for 24 hours
  • 匿名
2013-05-23 12:26:38
As shown in Figure 1 located near XX Army Day bridge pile foundation engineering, which is more typical in Jinan area in Piedmont red diluvium formation, pile 600mm diameter, length about 18m, mean time to pile more than 24 hours.
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭