当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:除工程图,标准,规范列表的相关要求之外,承包商还应遵守公司的可行标准,包括C6部分技术规范与工程图章节的相关要求。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
除工程图,标准,规范列表的相关要求之外,承包商还应遵守公司的可行标准,包括C6部分技术规范与工程图章节的相关要求。
问题补充:

  • 匿名
2013-05-23 12:21:38
In addition to engineering drawings, standards, requirements specification list, the contractor shall comply with the company's possible standards, including C6 technical specifications and drawings some sections of the relevant requirements.
  • 匿名
2013-05-23 12:23:18
In addition to the Agency map list, standards, norms, the relevant requirements, the contractor should also abide by the Company's 6 Part C viable standards, including technical norms and plans for construction projects of chapters related requirements.
  • 匿名
2013-05-23 12:24:58
Except the engineering plat, the standard, beside the standard tabulation correlation request, the contractor also should observe the company the feasible standard, including C6 partial technology standard and engineering plat chapter correlation request.
  • 匿名
2013-05-23 12:26:38
In addition to engineering drawings, standards, specifications list of the related requirements, the contractor should also comply with possible standards for the company, including part C6 technical specifications and related requirements of the engineering drawing section.
  • 匿名
2013-05-23 12:28:18
In addition to engineering drawings, standards, requirements specification list, the contractor shall comply with the company's possible standards, including C6 technical specifications and drawings some sections of the relevant requirements.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭