求翻译:总规划容量为30万千瓦,其中一期10.9万千瓦,于2008年开工建设,已于2010年10月中旬一期机组并网发电是什么意思?

待解决 悬赏分:1 - 离问题结束还有
总规划容量为30万千瓦,其中一期10.9万千瓦,于2008年开工建设,已于2010年10月中旬一期机组并网发电
问题补充:

  • 匿名
2013-05-23 12:21:38
The total planned capacity of 300,000 kilowatts, of which a 109 thousand kilowatts, started construction in 2008, was in mid-October 2010, a unit grid
  • 匿名
2013-05-23 12:23:18
Overall planning capacity of 301,000 kW, while at the same time, 1.01 million kW in 2008, construction was started on a mid-term October 2010 crew and grid generation
  • 匿名
2013-05-23 12:24:58
The total plan capacity is 300,000 kilowatts, issue of 109,000 kilowatts, begin the construction in 2008, an issue of unit incorporated the electricity generation in 2010 mid-October
  • 匿名
2013-05-23 12:26:38
Planned capacity of 300,000-kilowatt, of which 109,000 kW, in 2008, construction started, have in mid-October 2010 issue of MW grid-connected power generation
  • 匿名
2013-05-23 12:28:18
The total planned capacity of 300,000 kilowatts, of which a 109 thousand kilowatts, started construction in 2008, was in mid-October 2010, a unit grid
 
 