当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2011年9月10日我方对A99#桩进行开挖,将露筋处的渣泥和疏松的混凝土清除干净,在桩身保护层都完好的情况下,继续下挖100mm。经检查,未出现露筋等异常情况,当天通过灌浆前验收。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2011年9月10日我方对A99#桩进行开挖,将露筋处的渣泥和疏松的混凝土清除干净,在桩身保护层都完好的情况下,继续下挖100mm。经检查,未出现露筋等异常情况,当天通过灌浆前验收。
问题补充:

  • 匿名
2013-05-23 12:21:38
September 10, 2011 our excavation of the A99 # piles, the slag will be exposed tendons at the mud and loose concrete cleaned, protective layer in the pile are intact, to continue digging under 100mm. The inspection does not appear exposed tendons and other anomalies, the day before the acceptance by
  • 匿名
2013-05-23 12:23:18
Our side September 10, 2011 99 # piles of A digging exposed tendon Department, will be the standard chartered out clean mud and loose concrete piles, in layers of protection are intact, continue to the next dug 100 mm . Ruth did not occur on a check, tendons, and other anomalies in the day, before g
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
On September 10, 2011 we are A99# piles for excavation, exposed tendons loose concrete sludge and clean, in the case of pile layer intact, continue to the next dig 100mm. The inspection does not appear exposed anomalies such as gluten, through acceptance before filling the same day.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭