当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:To commit the sustainability strategy, Stora Enso entrusted UNDP China in undertaking the Environmental and Social Impact Analysis (ESIA). The ESIA report was completed in 2006. And the Forest Base Environmental Impact Assessment (forest EIA) was made in 2008 in line with the Chinese legislation regarding proposed fore是什么意思?

待解决 悬赏分:1 - 离问题结束还有
To commit the sustainability strategy, Stora Enso entrusted UNDP China in undertaking the Environmental and Social Impact Analysis (ESIA). The ESIA report was completed in 2006. And the Forest Base Environmental Impact Assessment (forest EIA) was made in 2008 in line with the Chinese legislation regarding proposed fore
问题补充:

  • 匿名
2013-05-23 12:21:38
为了实施可持续发展战略,斯道拉恩索下采取委托开发署中国环境与社会影响分析(ESIA)在。该ESIA报告完成于2006年。和林业基地环境影响评估(EIA森林)是在2008年与中国有关建议森林,纸浆和纸张一体化项目立法相一致。目前,斯道拉恩索与联合国开发计划署合作进行为整个综合森林,纸浆和造纸项目包括SEGX种植和上市,在北海市铁山工业园的建议纸浆厂新ESIA。
  • 匿名
2013-05-23 12:23:18
实施战略的可持续性,斯托厄尔尼诺/南方涛动委托开发计划署在中国进行的环境和社会影响分析(esia)。 esia的报告是于2006年完成。 和林基地环境影响评估(森林评估),已于2008年在中国法例提出关于森林、纸浆和纸张综合项目。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
若要实施可持续发展战略,斯道拉恩索委托开发计划署中国进行环境和社会影响分析 ("顽固")。埃西亚报告在 2006 年完成。林基地环境影响评估 (环评林) 作出符合我国立法建议森林有关 2008 年纸浆和造纸综合的项目。目前,进行新的顽固全程综合的森林、 纸浆和造纸项目,其中包括斯道拉恩索人工林和拟议的纸浆厂在北海市铁山工业园开发计划署与斯道拉恩索合作。
  • 匿名
2013-05-23 12:28:18
为了实施可持续发展战略,斯道拉恩索下采取委托开发署中国环境与社会影响分析(ESIA)在。该ESIA报告完成于2006年。和林业基地环境影响评估(EIA森林)是在2008年与中国有关建议森林,纸浆和纸张一体化项目立法相一致。目前,斯道拉恩索与联合国开发计划署合作进行为整个综合森林,纸浆和造纸项目包括SEGX种植和上市,在北海市铁山工业园的建议纸浆厂新ESIA。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭