当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:通过分析分布式电源的装机容量、并网方式、容量与负荷配比、接入崇明电网后给系统带来的影响,提出了安全接入分布式电源的相关建议和解决方法。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
通过分析分布式电源的装机容量、并网方式、容量与负荷配比、接入崇明电网后给系统带来的影响,提出了安全接入分布式电源的相关建议和解决方法。
问题补充:

  • 匿名
2013-05-23 12:21:38
Through the analysis of distributed power installed capacity, and nets, capacity and load ratio, access to the system after power Chongming impact of proposed distributed power secure access relevant recommendations and solutions.
  • 匿名
2013-05-23 12:23:18
Through the analysis of distributed power installed capacity, capacity, and Web Form and load matching, access to the system after Chongming grid, the impact on the security access distributed power of relevant recommendations and solutions.
  • 匿名
2013-05-23 12:24:58
After analyzes the distributional power source the installed capacity, the incorporation way, the capacity and the load allocated proportion, turns on the Chongming electrical network the influence which brings to the system, proposed turns on the distributional power source safely the correlation s
  • 匿名
2013-05-23 12:26:38
Through the analysis of distributed generation, grid-connected, capacity and load ratio of installed capacity of Chongming power system, access to the system after the impact of, put forward relevant recommendations and resolutions of the security access distributed power.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭