当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The mill setup calculation may be requested a number of times by external tracking logic, typically commencing with slab discharging from the reheat furnace. Calculations may be requested at key stages of rolling, such as slab discharge from the reheat furnace, after the last roughing pass and when the headend of the 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The mill setup calculation may be requested a number of times by external tracking logic, typically commencing with slab discharging from the reheat furnace. Calculations may be requested at key stages of rolling, such as slab discharge from the reheat furnace, after the last roughing pass and when the headend of the
问题补充:

  • 匿名
2013-05-23 12:21:38
轧机设定计算可能多次要求外部跟踪逻辑,通常开始板坯从加热炉排放。计算可能会被要求在滚动,如板坯加热炉排放后,在过去的粗加工通过时,酒吧的前端达到精轧机入口区的关键阶段。额外的计算可能继续地带进入初轧机站。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
轧机安装程序计算可能会多次要求的外部跟踪逻辑,通常起板坯加热炉泄。计算可能需要滚动,如板坯加热炉,最后粗加工走刀后出院和栏的前端当达到精轧机入区的关键阶段。其他计算可能会继续带将进入每一个初轧机的看台。
  • 匿名
2013-05-23 12:28:18
轧机设定计算可能多次要求外部跟踪逻辑,通常开始板坯从加热炉排放。计算可能会被要求在滚动,如板坯加热炉排放后,在过去的粗加工通过时,酒吧的前端达到精轧机入口区的关键阶段。额外的计算可能继续地带进入初轧机站。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭