当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:风力发电功率预测及应用系统在时间技术要求上必须具备1天前预测功能,每天10:00前预测次日(0~24)h的风电功率,时间分辨率15 min,用于制订发电计划;(0~6)h滚动预测,用于调度员实时监控;(0~15)min超短期滚动预测,用于AGC控制。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
风力发电功率预测及应用系统在时间技术要求上必须具备1天前预测功能,每天10:00前预测次日(0~24)h的风电功率,时间分辨率15 min,用于制订发电计划;(0~6)h滚动预测,用于调度员实时监控;(0~15)min超短期滚动预测,用于AGC控制。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The wind power generation power forecast and the application system must have 1 day in the time specification ago to forecast the function, every day in front of 10:00 forecast next day (0~24)h the wind electric power, time resolution 15 min, uses in drawing up the electricity generation plan; The (
  • 匿名
2013-05-23 12:26:38
Wind power prediction and application time on technical requirements, the system must have the function of 1 day ago, a day before 10:00 forecasts the next day (0~24) h of wind power, time resolution 15 min, used to develop power generation planning, (0~6) h rolling forecast, for real-time monitorin
  • 匿名
2013-05-23 12:28:18
Wind power forecasts and technical requirements for applications in time 1 day ago must have a forecast, daily forecast before 10:00 the next day (0 ~ 24) h of wind power, time resolution 15 min, for the development of power generation plan; (0 ~ 6) h rolling forecasts, real-time monitoring for disp
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭