当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:2011年10月,液体二号楼水针车间对超滤系统进行了确认,确认批次分别为:11100621、11100721、11100821,确认结果符合方案VR-4394-2011的标准是什么意思?

待解决 悬赏分:1 - 离问题结束还有
2011年10月,液体二号楼水针车间对超滤系统进行了确认,确认批次分别为:11100621、11100721、11100821,确认结果符合方案VR-4394-2011的标准
问题补充:

  • 匿名
2013-05-23 12:21:38
October 2011, the liquid water injection plant on the second floor ultrafiltration system was confirmation batch were: 11100621,11100721,11100821, confirmation of results consistent with the program VR-4394-2011 standard
  • 匿名
2013-05-23 12:23:18
October 2011 Building No. 2, the liquid water needle workshop on ultra-filtration system was confirmed by installment, confirmed: 11.100621 million respectively, 11.100721 million , 11.100821 million program to confirm results consistent with the standard VR - 4394 - 2011
  • 匿名
2013-05-23 12:24:58
In October, 2011, between the liquid second building water sewing machine to ultra filtered the system to carry on the confirmation, the confirmation raid respectively is: 11100621st, 11100721, 11100821, confirmed the result conforms to the plan VR-4394-2011 standard
  • 匿名
2013-05-23 12:26:38
In October 2011, liquid water on the second floor workshop on ultra-filtration system has been confirmed, confirmed batch were:, 11,100,621, 11,100,821, confirm that the results that are consistent with programme VR-4394-2011 standard
  • 匿名
2013-05-23 12:28:18
October 2011, the liquid water injection plant on the second floor ultrafiltration system was confirmation batch were: 11100621,11100721,11100821, confirmation of results consistent with the program VR-4394-2011 standard
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭