当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Winding #1 is the primary winding. Winding #2 is the secondary winding. Winding #3 is the tertiary winding. There is a fault terminal (N13) on the secondary winding. If the fault terminal is open circuited, the transformer would behave as a three winding auto transformer model.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Winding #1 is the primary winding. Winding #2 is the secondary winding. Winding #3 is the tertiary winding. There is a fault terminal (N13) on the secondary winding. If the fault terminal is open circuited, the transformer would behave as a three winding auto transformer model.
问题补充:

  • 匿名
2013-05-23 12:21:38
绕组#1初级绕组。绕组#2是次级绕组。绕组#3第三绕组。出现故障,终端上的二次绕组(N13)。如果故障终端开路,会表现为三绕组自耦变压器模型变压器。
  • 匿名
2013-05-23 12:23:18
#1是清盘的首要清盘。 清#2是清盘的中学。 #3是清盘的高等教育清盘。 有过失终端(n.13)有关清盘的中学。 如果该故障终端是公开短路,变压器的行为就会作为一个三清盘自动变压器示范。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
缠绕 # 1 是主清。绕组绕组 # 2。绕组 # 3 是专上清。二次清有故障终端 (N13)。变压器短路故障终端处于打开状态,如果将表现为三绕组自动变压器模型。
  • 匿名
2013-05-23 12:28:18
绕组#1初级绕组。绕组#2是次级绕组。绕组#3第三绕组。出现故障,终端上的二次绕组(N13)。如果故障终端开路,会表现为三绕组自耦变压器模型变压器。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭