|
关注:1
2013-05-23 12:21
求翻译:万达广场过江东中路过街通道施工中沉管桩的处理是什么意思? 待解决
悬赏分:1
- 离问题结束还有
万达广场过江东中路过街通道施工中沉管桩的处理
问题补充: |
|
2013-05-23 12:21:38
Wanda Plaza, through the construction of Jiangdong Road Guojietongdao sink pipe handling
|
|
2013-05-23 12:23:18
Over 10,000 square in Gangdong-gu passing street crossing immersed tube piles of construction in dealing with
|
|
2013-05-23 12:24:58
East ten thousand reaches the square to cross the river in the middle of the mill street channel construction to sink steel pipe driven in as piling processing
|
|
2013-05-23 12:26:38
Wanda square jiangdong road, cross channel construction of sinking pipe piles in treatment
|
|
2013-05-23 12:28:18
正在翻译,请等待...
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区