当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:It is conducted to evaluate and assure the load cell to have the necessary qualifications with BIFMA standard Tolerance requirement是什么意思?

待解决 悬赏分:1 - 离问题结束还有
It is conducted to evaluate and assure the load cell to have the necessary qualifications with BIFMA standard Tolerance requirement
问题补充:

  • 匿名
2013-05-23 12:21:38
It is conducted to evaluate and assure the load cell to have the necessary qualifications with BIFMA standard Tolerance requirement
  • 匿名
2013-05-23 12:23:18
It is conducted to evaluate the load cell to assure and have the necessary qualifications with standard BIFMA Tolerance requirement
  • 匿名
2013-05-23 12:24:58
It is conducted to evaluate and assure the load cell to have the necessary qualifications with BIFMA standard Tolerance requirement
  • 匿名
2013-05-23 12:26:38
It is conducted to evaluate and assure the load cell to have the necessary qualifications with BIFMA standard Tolerance requirement
  • 匿名
2013-05-23 12:28:18
It is conducted to evaluate and assure the load cell to have the necessary qualifications with BIFMA standard Tolerance requirement
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭