当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Because of the fine machining tolerance and feed, the size of the NC part programs was considerable, occupying more than 2 Mb of memory. For this reason, the NC part program for finish milling was divided into two files: whilst one was being executed on the milling machine, the other could be concurrently post-processe是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Because of the fine machining tolerance and feed, the size of the NC part programs was considerable, occupying more than 2 Mb of memory. For this reason, the NC part program for finish milling was divided into two files: whilst one was being executed on the milling machine, the other could be concurrently post-processe
问题补充:

  • 匿名
2013-05-23 12:21:38
由于精细加工的宽容和饲料,NC零件程序的大小相当,占地超过2 MB的内存。出于这个原因,精铣的NC零件程序分为两个文件,​​而一个被执行铣床,可同时后处理。研磨和抛光的总时间约为40小时
  • 匿名
2013-05-23 12:23:18
因为罚款的加工容忍和饲料的大小NC部分方案是相当大的,占领更多於2MB的内存。 出于这一原因,NC部分方案为完成磨分为两个文件:虽然一正在执行的磨粉机,其他可以同时后处理。 的总时间碾磨和抛光药是约40H。
  • 匿名
2013-05-23 12:24:58
由于美好的用机器制造的容忍和饲料,北卡罗来纳部分计划的大小是可观的,占领超过2兆位记忆。 为此,北卡罗来纳部分计划为结束碾碎被划分了成二个文件: 你在铣床被执行,其他可能一致地后加工。 总时间为碾碎和擦亮约为40 h。
  • 匿名
2013-05-23 12:26:38
由于精细加工公差和饲料、 数控部分程序的大小非常可观,占领超过 2 Mb 的内存。为此,数控铣削加工完成部分程序分为两个文件: 一个正在执行铣削机上,虽然其他可以兼后处理。铣削和打磨的总时间是 40 小时左右。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭