当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:我的主要职责是供配电,对安装好的高低压盘柜进行检查,交接试验,调试现场电机及其他电气设备,确保及时送电,保证试车顺利进行。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
我的主要职责是供配电,对安装好的高低压盘柜进行检查,交接试验,调试现场电机及其他电气设备,确保及时送电,保证试车顺利进行。
问题补充:

  • 匿名
2013-05-23 12:21:38
My main responsibility is for the distribution of high and low voltage enclosure installed to check the transfer test, debug, on-site motor and other electrical equipment to ensure the timely transmission to ensure the test carried out smoothly.
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
My primary interest is for the power distribution, to the high and low pressure plate cabinet which installs carries on the inspection, the connection experiment, debugs the scene electrical machinery and other electrical equipment, guarantees the prompt power transmission, guaranteed the test run c
  • 匿名
2013-05-23 12:26:38
I have the main responsibility for supply and distribution, high and low pressure enclosure to install good check, transfer test, adjustment and other electrical equipment to ensure the timely transmission to ensure smooth trial run.
  • 匿名
2013-05-23 12:28:18
My main responsibility is for the distribution of high and low voltage enclosure installed to check the transfer test, debug, on-site motor and other electrical equipment to ensure the timely transmission to ensure the test carried out smoothly.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭