当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:冬季施工时,砂、石的含水率要现场进行测定,及时调整水灰比及砂、石比例。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
冬季施工时,砂、石的含水率要现场进行测定,及时调整水灰比及砂、石比例。
问题补充:

  • 匿名
2013-05-23 12:21:38
Winter construction, sand, stone water content were measured to the scene, adjust the water-cement ratio and sand, stone ratio.
  • 匿名
2013-05-23 12:23:18
winter time of its construction, sand, stone of moisture content to the site measured, timely adjustment of water cement ratio and sand, stone proportion.
  • 匿名
2013-05-23 12:24:58
When winter construction, the granulated substance, the stone moisture content wants the scene to carry on the determination, adjusts the water ratio and the granulated substance, the stone proportion promptly.
  • 匿名
2013-05-23 12:26:38
Winter construction, sand and stone determination of water content to the site to, timely adjustment of water cement ratio and proportion of sand and stone.
  • 匿名
2013-05-23 12:28:18
Winter construction, sand, stone water content were measured to the scene, adjust the water-cement ratio and sand, stone ratio.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭